Quantcast
Channel: SCN: Message List - SAP ERP - Logistics Materials Management (SAP MM)
Viewing all 9093 articles
Browse latest View live

Re: Synchronization classification from MM to SRM (CA-CL)

$
0
0

How to scheduled it immediatly after "SAVE"?


Re: Synchronization classification from MM to SRM (CA-CL)

$
0
0

Jobs can be scheduled event triggered

Re: Synchronization classification from MM to SRM (CA-CL)

$
0
0

You schedule based on changes , that is based on event based ......

Re: Issue with Batch Recording Method in LSMW

$
0
0

Hi,

Check these things on recording.

Capture.JPG

Then check this on "Maintain Source Fields"

Capture.JPG

Maintain Excel like that for plant portion.

Capture.JPG

Capture.JPG

You can see the Plant value in "Display Read Data" as above.

 

Please check these.

 

Thanks

DEV

Re: Issue with Batch Recording Method in LSMW

$
0
0

And i have checked you screen shot.

Where is the plant value?

Converted+Data.jpg

Thanks

DEV

Wrong planning because Intercompany process by SchLne

$
0
0

Dear all,

 

We have a tipical situation in intercompany process.

 

We use a SchLne to already transfer goods to another plant, after send the goods of one plant to another plant and have the billing, the stock stay in transit, so, we already have the ShpgNt in MD04 in receiving plant, and the SchLne in MD04 continues influencing directly of the future needs planning in MD04. The correctly situation is the SchLne desappear of the MD04 because I already have the ShpgNt.

 

Do you havethis situationand hasa solutionfor thisproblem?

Re: Error 'No conversion factor for material & UOM' in MIGO

$
0
0

Hi Mallinath,

 

I am checking with user what is the reason to enter different UOMs when they created PO for direct consumption. Before I advise user, I would like to know why SAP prompts error when there is no material.

 

Hi Dev Patra,

 

Thanks for the reply. The message number and message id is 6R094

 

Re: Synchronization classification from MM to SRM (CA-CL)


Re: Error 'No conversion factor for material & UOM' in MIGO

$
0
0

Hi shaik meera,

 

You need to maintain the conversion of UOM inmaterial master.

Please find the screen shot as below for the same.

 

Open the material master in MM02 and Click on Additional Data tab.

c1.png

Click on Units Of Measuer Tab. Maintain the conversion here.YOur issue will resolve.

c2.png

 

Regards,

Pravin

Re: Purchase order text in material master

Material Movement details from Excel sheet to MB1B screen-Export/upload

$
0
0

  Dear Friends,

 

Can anyone tell me is there any option to copy-paste the details from an excel sheet to SAP- MB1B screen with more than one tab? For eg- for material movement in MB1B screen, we need to enter Material, quantity, Unit of measurement and Batch #.  At present, there is no option to copy-paste all these details in one go, as the screen will not allow to enter the same, rather we need to enter one by one in system.  Please share if you have any option to copy-paste from excel sheet or direct upload in the MB1B screen(material movement).

 

Thanks

Mahesh Rajan

Re: Material Movement details from Excel sheet to MB1B screen-Export/upload

$
0
0

Best option is to create an LSMW or BDC for one record and try to update every time with excel using that program that all..........

Re: Material Movement details from Excel sheet to MB1B screen-Export/upload

$
0
0

Hi,

We can't copy like that from excel to SAP.

You can write an LSMW program..

 

Thanks

DEV

Material Movement details from Excel sheet to MB1B screen-Export/upload

$
0
0

do you really put so much effort into your Excel sheet that you could copy/paste the content into the SAP screen ?

It is technically not possible to paste something into invisible fields/fields of a non-active tab.

 

Maybe you could explain the big picture why this is needed at all, eventually there are other ways.

Further you should already invest into your future and get used to MIGO, the old MB transaction will be gone with the next release.

Re: Material Movement details from Excel sheet to MB1B screen-Export/upload

$
0
0

Go for the MIGO .Its easy to upload the data instead of MB1B


Re: Material Movement details from Excel sheet to MB1B screen-Export/upload

$
0
0

Yes Mr.Jurgen, i spent a little time for finding out a solution for copy-paste from Excel sheet to MB1B screen.  Why because, in my organisation, there will so many requests will come to our way for transfering stock from one storage location to another, unrestricted stock to blocked stock and vise-versa, and so on.  For all these transaction, there will also be a large number of data to transfer as mentioned.  Here, we need a solution, to enter all the details in one go, if it is possible. So i just thought to share my view with you all.  Anyway, thanks for replying to my comment. 

Re: Material Movement details from Excel sheet to MB1B screen-Export/upload

$
0
0

Hi Anil, can you pls explain, how can i upload material details of more than 10 numbers with their quantity, UoM & batch # is available with me?

Re: Material Movement details from Excel sheet to MB1B screen-Export/upload

Re: Material Movement details from Excel sheet to MB1B screen-Export/upload

Release strategy for PR without classification after go live

$
0
0

Hi

 

can we configure Release strategy for PR without classification post go live??

As of now Client using PO release strategy only,

now they also want to have PR release strategy which was not configured at the time of go live, they have 4 months post go live,

there would be open PRs as on date , what are the inconsistency? what measures should be taken care to set the procedure?

Kindly suggest,

Viewing all 9093 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>