Re: Previous Stock Report?
dear Shwetagood day I face same issue before and i create Query by using T-code sqvi and i use tables (MBEW-MSEG -MKPF-MARD -MAKT ) after that you can create T-code for this Query this is the selection...
View ArticleRe: Previous Stock Report?
This is just a movement report with the current stock. It is not the stock from the day of movement
View ArticleRe: MRP configuration
Nassar Fathy, thanks for your answer. Basically we need to know if during automatic purchase requisition creation (triggered by mrp), the system checks the availability stock of the plant supplier and...
View ArticleRe: Need a suitable field in mm01 to use as the flexible planning indicator
In general all fields in the material master tables have their desired usage. It might be that there is the one or other field which is not used in your current design, but who knows today if you need...
View ArticleRe: MRP configuration
Isn't the main purpose of MRP to take care that you always have enough stock to cover the needs?If MRP comes to know that there is not enough stock then MRP has to create a requisition or planned...
View ArticleRe: Price list problem
the "how" is clear: the Idoc is created by your custom programand the 53 is clear too: The Idoc was posted, hence it has to go to green and 53The Idoc had technically no incorrect data. It had just not...
View ArticleRe: To prevent upload of incorrect file in LSMW
Thank you Jurgen! This solution works for my requirement.Best Regards,Baskar
View ArticleRe: Services PRs partially converted to PO are not showing in ME5A report
Hi Dev Sir, You are right, I am able to see the PR when i checked Closed requisition in selection screen.But it converted Partially not fully, then it has to show in pending list. Regards, B V
View ArticleRe: Services PRs partially converted to PO are not showing in ME5A report
As I have said, it is not considering the service quantity (which is showing in Service tab). It is calculating PR quantity with compare to PO quantity.You PR quantity is 1 AU and also your PO quantity...
View ArticleRe: Services PRs partially converted to PO are not showing in ME5A report
how can we get partially converted service PRs any suggestion sir? Regards, B V
View ArticleImport (Foreign) Procurement, Exchange rate difference variants and Gate Pass...
Currently I am working on designing the solution for 3 topics mentioned in the email title. I would like people to share their experience/suggestions on these topics so that I have experts opinion as...
View ArticleRe: Services PRs partially converted to PO are not showing in ME5A report
Hi Once Service PR is converted in to PO, Then system considers as Closed. Because system considers the PR qty as 1 AU and PO Qty as 1 AU. So, you are getting the details if you check the closed...
View ArticleRe: Previous Stock Report?
dear Mr. jurgen many thanks , i checked it and you are Right , thank you for your support regards nassar
View ArticleRe: MD02 - MRP Control Parameters - Create Pur.Req
Hi Patrícia If you are running MRP with the parameter planning mode = 3, MRP will intentionally delete and recreate all the purchase requisitions. Also, even with planning mode 1 or 2 MRP may chage...
View ArticleRe: MRP configuration
Hello MRP does not carry out the ATP check on a stock transfer on the supplying plant. It means that MRP create the stock transfer requisition, irrespectively of the stock on your supplying plant. If...
View ArticleRe: Import (Foreign) Procurement, Exchange rate difference variants and Gate...
Hi, 1. You may check the concept of Transportation Management to incorporate the requirement. Through TM, you can create shipment and shipment cost documents using inbound delivery before GR. Once...
View ArticleRe: Make Serial No. Mandatory
Hi, Hope you are on or above EHP 4 and the business function LOG_MM_SERNO is activated. If so, please check the doc: Serial Numbers in Purchasing which explains the option in standard. Please check...
View ArticleRe: Displaying All Service Entry in PO (Shipment Costing)
I'll try this solution and let you know guys what happened. There's no ML83N though, which version is this available on?
View Articlemb1b 541 movement
Dear experts, I am doing 541 movement through mb1b transaction with reference to purchase order. problem is purchase order has 10 down level materials. at the time of 541 movement system is picking...
View ArticlePlant level restriction for Scheduling agreement outbound IDOC
Hi Experts, I would like to know how we can restrict the ORDERS outbound IDOC being sent to a third party system for any changes in scheduling agreements for some specific plants. Regards,Mohammed...
View Article