Dear Experts
- I have a scenario where I want to trigger 'BATMAS' Idoc, the moment a batch is 'Created' and BD21 is executed(MSC1n Transaction or automatically during GR). However currently it is not getting created.
- However BATMAS gets triggered when we change the Batch (change relevant fields) and execute BD21.
- My BD64 / BD52 and all other settings are in place.
- What issue that I could locate was : When I create a new Batch, BDCP2 table does not get updated with a change pointer (for 'Insert' - (I) ) record. When I change the batch for change relevant fields, BDCP2 table gets updated with a change pointer (for Update / Modify (U) record.)
Can anyone please suggest what is wrong here and how can we ENSURE creation of an entry in BDCP2 table
Or
How can we ensure BATMAS idoc is triggered at every new batch creation
Regards
Rahul Soman