Optimal PurReq Quantity Using Tiered Pricing

$
0
0

Hello All,

 

I'm reaching out to see if there's a mechanism within MRP to propose the optimal PReq quantity utilizing tiered pricing from the PIR.

 

I want the proposals to consider the optimal tier, while taking into consideration the holding cost for excess inventory.

 

For example, if a supplier will provide an extra 200 pieces, above requirements, to achieve a lower piece price, will the extra holding cost be less than the per piece savings?

 

Are there settings that may support this effort within the materials master etc.?

 

Much thanks,

 

Matt