All,
We have a scenario where in the requirement is to trigger a JIT call when the Kanban bin is made empty without the MRP. I tried with having the MRP type as ND and leaving the storage location in planning but not able to trigger the JIT call.
Getting the error message "No message record found for summarized JIT call" even after maintaining output in PJNK2.
Any thoughts if we can trigger a JIT call in form of schedule line without MRP.
thanks in advance.
Mahesh.