Hi, I have an issue with the tcode MMNR, I have realized that a material type that is control by internal number asignation is not asign to any group in MMNR which result in not leting to create any material. when I check modification log I only see chenges from almost a year ago, however this problem occurred in the last 15 days, which mean that there was a change during this period.
¿It is possble that other program or tcode can do changes in MMNR without having tracing in log?
¿it is possible to do changes directly in MMNR without tracing logs?
Thanks
Jorge G