Hi All,
In MRP4 view, in discontinued part, if we set follow-up material, MRP will trigger requests for the follow –up material if the stock of existing material is zero.
Now there is a requirement, so that even though follow-up material is updated, system should be trigger any requirement for the existing one, though the stock is zero, ie, the follow up material is only for an information .
Is it possible ? can we do it with changing the effectively of date in eff.out (set it as future unlimited)
Thanks for the help.
Regards,
Vijesh