Dear Sir,
I was created value (WK) based contract with Target value 10000 INR. Below material, Quantity and value we had mention in value based contract.
PO line Material Quantity Net price
10 1000123 1 100
Through that Value based contract I am creating call out order (PO) with quantity 5. At that time system giving me error that target quantity 4 is exceeds.
As per my understanding if it is value contract while creating RO against contract it should only control value not the quantity but here why system controlling quantity.?
Thanks,